IAP Events
Events Calendar Print Write e-mail help
Previous month Previous day Next day
See by year See by month See by week See Today Search Jump to month
סמינר מחלקתי Download as iCal file
Tuesday, December 11, 2012, 14:00 - 15:00
כתובת דוא"ל זו מוגנת מפני spambots, יש לאפשר JavaScript על-מנת לראות את הכתובת Hits : 78

Formulating and Solving a Multi-Mode Resource-Collaboration and Constrained Scheduling Problem (MRCCSP)

Gaby Pinto  - Department of Industrial Engineering and Management, Jerusalem Collage of Engineering

Abstract:

The main motivation of this study is to provide for the first time a formulation and solution for a class of production scheduling problems (as in cluster tools) characterized mainly by resource collaboration to perform an operation, while allowing batches and considering alternative production methods. We develop a formulation for the new problem and term it a multiple mode per operation, resource collaboration, and constrained scheduling problem (MRCCSP). Some of the important new characteristics we consider are: multiple products (families); Multiple orders (jobs) per family; Precedence restrictions among the operations that constitute a job; Alternative modes for the performance of an operation (each of which needs a set of collaborating resources) may be defined; Complementary and exclusive restrictions between operation-modes; Batch production is allowed; and setup times may depend on sequence and batch-size. The objective of the MRCCSP is to minimize makespan. We formulate the MRCCSP as a mixed integer linear programming model, and acknowledging the considerable size of the monolithic formulation required, we prescribe a specific method to achieve size reduction. Finally, a customized branch and bound algorithm for optimally solving this problem is proposed and examined experimentally.

 

ההרצאה תתקיים ביום שלישי, 11.12.12, בשעה 14:00 בחדר 206, בנין וולפסון הנדסה, הפקולטה להנדסה, אוניברסיטת תל-אביב

Back

JEvents v1.5.5   Copyright © 2006-2010