Yossi Buckchin's Selected Publications

In Refereed Journals

  • Rubinovitz, J. and Bukchin, J., 1993, "RALB - A Heuristic Algorithm for Design and Balancing of Robotic Assembly Lines", Annals of the CIRP, vol. 42/1/1993, 497-500. (pdf file)
  • Bukchin, J., Dar-El, E.M. and Rubinovitz, J., 1997, “Team Oriented Assembly System Design: A New Approach”, International Journal of Production Economics, 51(1,2), 47-57. (pdf file)
  • Bukchin, J., 1998, “A Comprehensive Study of Performance Measures for Throughput of Mixed Model Assembly Line in JIT Environment”, International Journal of Production Research, 36, 10, 2669 - 2685. (pdf file)
  • Bukchin, J. and Tzur, M., 2000, “Design of Flexible Assembly Line to Minimize Equipment Cost”, IIE Transactions, 32, 7, 585-598. (pdf file)
  • Arzi, Y., Bukchin, J. and Masin M., 2001 “Cellular Manufacturing System Design for Lumpy Demand”, European Journal of Operational Research, 134, 2, 346-364. (pdf file)
  • Bukchin, J, Luquer, R., and Shtub, A., 2002, “Learning in Tele-Operations”, IIE Transactions, 34(3), 245-252. (pdf file)
  • Ben-Gal, I. and Bukchin J., 2002, “Ergonomic Design of Working Environment via Rapid Prototyping Tools and Design Of Experiments”, IIE Transactions, 34(4), 375-391. (pdf file)
  • Bukchin, J., Dar-El, E.M. and Rubinovitz, J., 2002, “Mixed Model Assembly Line Design in a Make-to-Order Environment”, Computers & Industrial Engineering, 41(4), 405-421. (pdf file)
  • Bukchin, J., Tzur, M., and Jaffe, M., 2002, "Lot Splitting to Minimize Average Flow Time in a Two-Machine Flowshop", IIE Transactions, 34(11), 953-970. (pdf file)
  • Bukchin, J. and Rubinovitz, 2003, J., "A Comprehensive Approach for the Line Balancing Problem with Station Paralleling", IIE Transactions, 35(1), 73-85. (pdf_file)
  • Bukchin, J. and Masin, 2004, M., “Multi-Objective Design of Team Oriented Assembly Systems”, European Journal of Operational Research, 156(2), 326-352. (pdf file)
  • Bukchin, J. and Masin, M., 2004, “Multi-Objective Lot-Splitting for a Single Product m-Machine Flowshop Line”, IIE Transactions, 36(2), 191-202. (pdf file)
  • Bukchin, J. and Sarin, S.C., 2004, “A Cyclic Policy for the Loading of Multiple Products on a Vehicle with Different Compartment Sizes”, IIE Transactions, 36(7), 641-653. (pdf file)
  • Bukchin, Y. and Meller, R.D., 2005, “A space allocation algorithm for assembly line Components”, IIE Transactions, 37(1), 51-61. (pdf file)
  • Bukchin, Y. and Rabinowitch I., 2006, “A Branch and Bound Based Solution Approach for Mixed-Model Line Balancing Problem for Minimizing Station and Task duplication Costs’, European Journal of Operational Research, 174(1), 492-508.(pdf file)
  • Bukchin, Y. and Meller, R. D., 2006, “Assembly System Facility Design”, IIE Transactions, 38(1), 53-65. (pdf file)
  • Bukchin, Y. and Sarin, S.C., 2006, “Discrete and Dynamic versus Continuous and Static Loading Policy for a Multi-Compartment Vehicle”, European Journal of Operational Research, 174(2), 1329-1337. (pdf file)
  • Anuar, R. and Bukchin, 2006, Y., “Design and Operation of Dynamic Assembly Lines Using Work-Sharing”, International Journal of Production Research, 44(18 –19), 4043 –4065. (pdf file)
  • Bukchin, Y. and Hanani, E., 2007, “Decentralization Cost in Scheduling – A Game Theoretic Approach”, Manufacturing & Service Operations Management (M&SOM), 9(3), 263-275. (pdf file)
  • Goldstain, O., Bukchin, Y. and Ben-Gal, I., 2007, “Remote Learning for the Manipulation and Control of Robotic Cells”. The European Journal of Engineering Education, Vol. 32 (4), 481-494. (pdf file)
  • Bukchin, Y. and Masin, M., “Diversity Maximization Approach for Multi-Objective Combinatorial Optimization”, Operations Research, Vol. 56, No. 2, March-April 2008, pp. 411-424. (pdf file)
  • Ben-Gal, I., Katz, R., and Bukchin, Y., 2008, “Robust Eco-Design: A New Application for Quality Engineering”. IIE Transactions, Vol. 40(10), 907-918. (pdf file)
  • Kahan, T., Bukchin, Y., Menassa, R. and Ben-Gal, I., 2009, “Backup Strategy for Robots' Failures in an Automotive Assembly System”. International Journal of Production Economics, Vol. 120(2), 315-326. (pdf file)
  • Bukchin, Y., Masin, M. and Kirshner, R., “Modeling and Analysis of Multi-Objective Lot Splitting for N-Product M-machine Flowshop Lines”. To appear in Naval Research Logistics. (pdf file)
  • Bukchin, Y. and Sofer, T., “Bi–Directional Work-Sharing in Assembly Lines with Strict and Flexible Assembly Sequences”, submitted. (pdf file)
  • Bukchin, Y., Khmelnitsky, E. and Yakuel, P., “Optimizing a Dynamic Order Picking Process”, submitted. (pdf file)

 

In Refereed Conference Proceedings

  • Rubinovitz, J. and Bukchin, J., “Design and Balancing of Robotic Assembly Lines”, Proceedings of the Fourth World Conference on Robotics Research, Pittsburgh, PA, Sept. 17-19 1991, SME 1991.
  • Rubinovitz, J. and Bukchin, J., “Design and Balancing of Robotic Assembly Lines”, Proceedings of the Seventh Conference on Industrial Engineering and Management 1992, Haifa, Israel,  Apr. 28-29, 1992 (In Hebrew).
  • Bukchin, J., Dar-El, E.M. and Rubinovitz, J., “Team Oriented Design of Mixed Model Assembly Systems”, Proceedings of the 13th International Conference on Production Research, Jerusalem, Israel, August 6-10, 1995.
  • Bukchin, J., Dar-El, E.M. and Rubinovitz, J., “Hierarchical Design of Team Oriented Assembly Systems”, Proceedings of the International Manufacturing Engineering Conference, university of Connecticut, Storrs, Connecticut, USA, August 7-9, 1996.
  • Arzi, Y., Bukchin, J. and Masin M., “Design of Cellular Manufacturing Systems in a Lumpy Demand Environment: a Statistical Approach”, Proceedings of the 10th Conference on Industrial Engineering and Management 1998, Haifa, Israel, June 2-3, 1998.
  • Arzi, Y., Bukchin, J. and Masin M., “The Effect of Lumpiness on Design of Cellular Manufacturing Systems”, INFORMS International Israel, Tel Aviv University, Israel, June 28-July 1, 1998.
  • Bukchin, J., Jaffe, M. and Tzur, M., “Batching to Minimize Flow Time on Two Machines”, Sixth International Workshop on Project Management and Scheduling, EURO, July 7-9, 1998, Istanbul, Turkey.
  • Bukchin, J. and Rubinovitz, J., “A Comprehensive Approach for the Line Balancing Problem with Station Paralleling”, The 15th International Conference on Production Research, August 9-12, 1999, Limerick, Ireland.
  • Bukchin, J., Jaffe M., and Tzur, M., “A Two-Machine Flowshop Batching Problem with Minimum Flow Time”, INFORMS (Institute for Operations Research and the Management Sciences) Fall meeting, Philadelphia, PA, USA, November 1999.
  • Ben-Gal, I., and Bukchin, J., “The Ergonomic Design of Workstation Using Rapid Prototyping and Response Surface Methodology”, Proceedings of the 11th Conference on Industrial Engineering and Management 1998, Beer-Sheva, Israel, May 3-4, 2000.
  • Garbya, S., Coiffet, P., Rubinovitz, J., Zussman, E., Bukchin, J., “Learning Conceptualization from Virtual Environment in Manual Assembly Task”, Proceedings of the 2nd International Symposium on Robotics and Automation, ISRA’2000, Monterrey, N.L. México, November 2000.
  • Bukchin, J. and Masin, M., “Team Oriented Assembly System Design Using an Efficiency Frontier Approach”, Proceeings of the IERC 2001, Dallas Texas, USA, May 2001.
  • Bukchin, J. and Masin, M., “Multi-objective lot-splitting for a single product m-station flowshops”, Proceeings of the IERC 2001, Dallas Texas, USA, May 2001.
  • Bukchin, J. and Meller, R. D., “Logistics & Layout of a Mixed Model Assembly Line”, INFORMS 2001 Annual Meeting, Miami Beach, USA, November 4-7 2001.
  • Bukchin, J and Sarin, S.C., “A Dynamic Policy for the Loading of Multiple Products on a Vehicle with Different Compartment Sizes”, INFORMS 2001 Annual Meeting, Miami Beach, USA, November 4-7 2001.
  • Bukchin, Y., and Meller, R.D., “Assembly Line Space Allocation”, 17th International Conference on Production Research, ICPR–17, Blacksburg, Virginia USA, August 3-7, 2003.
  • Bukchin, Y., Sarin, S.C. and Paul A., “On the Loading and Scheduling of Vehicles with Segregated Storage Compartments”, 17th International Conference on Production Research, ICPR–17, Blacksburg, Virginia USA, August 3-7, 2003.
  • Fengshtein A., Bukchin Y., Ben-Gal I., “Robust Design of Assembly Workstations via Virtual Manufacturing”, submitted to the 13th Industrial Engineering and Management Conference, Tel Aviv, March 16-17, 2004.
  • Katz R., Ben-Gal I., Bukchin Y., “Applying the Taguchi Method For a Robust Eco-Design”, 13th Industrial Engineering and Management Conference, Tel Aviv, March 16-17, 2004.
  • Anuar R. and Bukchin Y., “Dynamic Assembly Line Balancing Using Work Sharing”, 13th Industrial Engineering and Management Conference, Tel Aviv, March 16-17, 2004.
  • Bukchin, Y., and Meller, R.D., “Assembly System Layout Design”, IMHRC 2004
    8th International Material Handling Research Colloquium, Graz, Austria, 13th-17th June 2004.
  • Anuar R. and Bukchin Y., “Dynamic Line Balancing Using Work Sharing”, Proceeings of the IERC 2005, Atlanta, Georgia, USA, May 2005.
  • Bukchin Y., Khmelnitsky E, and Yakuel P., “Optimizing a Dynamic Order- Picking Process”, 14th Industrial Engineering and Management Conference, Tel Aviv, March 20-21, 2006.
  • Kahan, T., Bukchin, Y., Menassa, R. and Ben-Gal, I., “Backup Strategy for Robots' Failures in an Automotive Assembly System”, IIE Annual Conference and Exhibition 2006, Orlando, Florida, USA, May 20-24.
  • Bukchin, Y. and Ben-Zur O., “Robust Design of Assembly Lines for a Dynamic Changing Demand”, IIE Annual Conference and Exhibition 2007, Nashville, Tennessee, USA, May 19-23.
  • Kahan, T., Bukchin, Y., Menassa, R. and Ben-Gal, I., “Weld Reallocation In An Automotive Robotic Line Due To Robots Failures”, 12th IFAC Symposium on Information Control Problems in Manufacturing (INCOM’2006), Saint-Etienne, France, May 17-19.
  • Bukchin, Y. and Cohen T, “Bi-Directional Work Sharing in Assembly Lines under Precedence Relationship Constraints”, International conference on Industrial Logistics (ICIL-2008), Tel Aviv, Israel, March 9-15.
  • Bukchin, Y. and Cohen T., “Bi-Directional Work Sharing in Assembly Lines under Strict Order and Precedence Relationship Constraints”, IIE Annual Conference and Exhibition 2008, Vancouver, Canada, May 17-21.
  • Aharonov, S., Bukchin, Y. and Raviv, T., “Integrated Assembly Line Balancing and Inspection Allocation Problem in an Online Rework Environment”, International conference on Industrial Logistics (ICIL-2008), Tel Aviv, Israel, March 9-15.
  • Bukchin, Y., Rosenberg, R., Ben-Gal, I, Menassa, R., and Subramanyam, S., “Creating an Interactive Formulation for Welds Backup due to Robots' Failures”, International conference on Industrial Logistics (ICIL-2008), Tel Aviv, Israel, March 9-15.
  • Goldstain, O., Ben-Gal, I. and Bukchin, Y., Learning to Control and Manipulate Robotic Cells through the Internet”, International conference on Industrial Logistics (ICIL-2008), Tel Aviv, Israel, March 9-15.
  • Bukchin, Y., Khmelnitsky, E. and Yekuel P., “Optimizing Dynamic Order Picking Process”, 2008 International Material Handling Research Colloquium, Dortmund, Germany, May 28 – June 2.
  • International Conference on Industrial Logistics ICIL 2008, Proceedings, March 9-15, 2008, Tel Aviv, Israel, Editors: E.Menipaz, I. Ben-Gal, Y. Bukchin.
  • Rosenberg, R., Bukchin, Y. and Ben-Gal, “Deterministic and Dynamic Solution Approach for Welds Reallocation due to Robot's Failures, 13th IFAC Symposium on Information Control Problems in Manufacturing, INCOM ’09, June 3-5, 2009, Moscow, Russia.
  • Bukchin, Y. and Sofer, T., Bi–Directional Work-Sharing in Assembly Lines with Strict and Flexible Assembly Sequence, ICPR-20, August 2-6, 2009, Shanghai, China.

 

line

Return to:
[ Yossi Buckchin's home | Department of Industrial Engineering | Faculty of Engineering ]

line

Please send comments or questions about this page to: < webmaster@eng.tau.ac.il >

Last modified: Sun Mar 26 2010